Cleaning Job Quote Calculator

This cleaning quote calculator prices a job in seconds. Enter the floor area, type of clean, number of bathrooms and kitchens, extras like ovens and windows, your crew size and hourly rate, supplies and margin, and how often the client wants cleaning. It gives the quote, labour hours, time on site and price per square foot or metre, and can quote a whole list of sites. It runs in your browser.

Typical production rates

Typesq ft per hour
Standard home clean500
Deep clean300
Move-in / move-out250
Office2,500
Post-construction200

When to use it

  1. Quote a house clean over the phone.
  2. Price office contracts.
  3. Estimate a move-out or after-builders clean.
  4. Set regular-client discounts.
  5. Plan crew time for a day's jobs.

How to Use

  1. Enter area and type of clean.
  2. Add rooms, extras and crew.
  3. Set rate, supplies, discount and minimum.
  4. Read the quote or batch sites.

Features

  1. Five cleaning types
  2. Bathrooms, kitchens, extras
  3. Crew time on site
  4. Frequency discounts
  5. Minimum charge
  6. Site list batch

FAQs

How do I price a house clean?

Estimate hours from area and rooms, multiply by your hourly rate, add supplies and margin. A 1,800 sq ft home with 2 bathrooms takes about 5 labour hours for a standard clean.

How much faster is a two-person crew?

On-site time halves, but labour hours and cost stay the same.

Should regular clients get a discount?

Commonly 5–15% for monthly to weekly service, since repeat cleans are quicker.

What production rates should I use?

Time your team on a few jobs and adjust; the defaults are typical starting points.

Is anything uploaded?

No. Everything runs in your browser.

Technical Details

Labour hours = floor area ÷ a production rate for the type of clean (about 500 sq ft per hour for a standard home clean, 300 for deep cleans, 250 for move-in/out, 2,500 for open offices, 200 after construction) plus time per bathroom and kitchen and any extras. Price = hours × rate per cleaner hour + supplies, plus optional margin, less a frequency discount (weekly, every two weeks, monthly), and never below the minimum charge. On-site time divides hours by the crew size. Batch mode quotes a list of sites.

Business & Legal Tools

Business & Legal Tools

  • Event Seating Plan Maker
  • Invoice and Receipt Field Extractor
  • Garment Cost Sheet
  • Fabric Inspection (4-Point System)
  • Resume Keyword Scanner
  • Startup Runway Calculator
  • Startup Valuation Calculator
  • ESOP Calculator