This concrete mix calculator tells you how many cement bags and how much sand and crush (aggregate) you need for a pour at a given mix ratio. Enter the slab, footing, beam or column size in feet or meters, or the volume directly, pick a nominal mix from M5 (1:5:10) to M25 (1:1:2) or type your own ratio, and it applies the standard 1.54 dry-volume factor and your wastage allowance. Cement comes out in 50 kg bags or any bag size you choose, sand and aggregate in both cubic feet and cubic meters, and water from the water–cement ratio, so you can order from a supplier who quotes in cft or by truck. For a whole house, paste a list of every footing, column, beam and slab with its own mix and quantity, and each one is calculated with a downloadable total. It is free, runs entirely in your browser, and nothing you enter is uploaded.
| Mix | Cement (kg) | Bags | Sand (cft) | Aggregate (cft) |
|---|---|---|---|---|
| M5 (1:5:10) | 139 | 2.77 | 17.0 | 34.0 |
| M7.5 (1:4:8) | 171 | 3.41 | 16.7 | 33.5 |
| M10 (1:3:6) | 222 | 4.44 | 16.3 | 32.6 |
| M15 (1:2:4) | 317 | 6.34 | 15.5 | 31.1 |
| M20 (1:1.5:3) | 403 | 8.06 | 14.8 | 29.7 |
| M25 (1:1:2) | 554 | 11.09 | 13.6 | 27.2 |
About 6.3 bags of 50 kg, with 0.44 m³ (15.5 cft) of sand and 0.88 m³ (31.1 cft) of aggregate, before wastage.
Dry sand, cement and aggregate shrink in volume when mixed with water, because the finer materials fill the gaps. About 1.54 m³ of dry materials make 1 m³ of concrete.
Residential slabs, beams and columns usually use M20 (1:1.5:3); M15 (1:2:4) is common for footings and floors. Follow the structural drawings where they specify a grade.
Yes. Damp sand bulks by 20–25%, so measure it loose and add that much extra if it is wet.
No. All calculations run in your browser.
The wet concrete volume, from length × width × depth or entered directly in m³ or cubic feet, is increased by the wastage allowance and multiplied by 1.54 to get the dry volume of materials, because sand and cement fill the voids in the aggregate and the mix shrinks when water is added. The dry volume is split by the mix ratio (cement : sand : aggregate), so for 1:2:4 cement takes 1/7. Cement volume × 1,440 kg/m³ gives its mass, divided by the bag size (50 kg by default) for bags. Sand and aggregate are shown in m³ and cubic feet (1 m³ = 35.3147 cft). Water is the cement mass × the water–cement ratio. Batch mode reads one row per element with quantity and an optional mix such as M15 or 1:1.5:3.