This EV charging calculator estimates how long a charge will take and what it will cost. Enter the usable battery size, the charge you start and finish at, the charger's power and the most your car can accept, plus your electricity price, and it shows the charging time, the energy drawn including losses, the cost and the range added. It models the slow-down above 80% that most cars have. Fleet managers can paste a list of vehicles. It runs in your browser.
| Charger | Efficiency | Time |
|---|---|---|
| 2.3 kW socket | 90% | 17.4 h |
| 7.4 kW wall box | 90% | 5.4 h |
| 11 kW AC | 90% | 3.6 h |
| 22 kW AC | 90% | 1.8 h |
| 50 kW DC | 95% | 46 min |
| 150 kW DC | 95% | 15 min |
Energy needed ÷ charging power, plus losses. 60% of a 60 kWh battery is 36 kWh, about 40 kWh from the grid at 90% efficiency, so roughly 5.4 hours on a 7.4 kW charger.
On AC the car's onboard charger limits the rate (often 7–11 kW); on DC the car's maximum and battery temperature do.
Cars reduce power near full to protect the battery, so the last 20% can take as long as the 20–80%.
Typically 10–15% on AC and less on DC.
No. Everything runs in your browser.
Energy into the battery = usable capacity × (target − starting charge)%. Energy drawn from the grid = that ÷ charging efficiency. Charging power is the lower of the charger and the car's limit (its onboard charger on AC, its peak on DC). Above 80% the car charges at a chosen fraction of that power to model the taper. Time = energy ÷ power for each part; cost = grid kWh × price + any session fee; range added = battery kWh ÷ consumption. Batch mode reads one vehicle per row.